+

Contact Us

    Power Generation

    Case Study

    The Gilboa Pumped Storage Facility

    gilboa_2

    Background

    Located on the northeast side of Israel, this renewable energy plant is a complex, cutting-edge technology facility, comprised of various energy and water technologies from hydroelectric PP to water treatment and an enormous pumping mechanism.

    The iGreen System

    iGreen is used for supporting owner’s inspection of the O&M contractor, while dealing with strict complicated billing contractual procedure. iGreen’s wide range of data collection and normalization capabilities together with a strong efficient database and diverse set of business intelligence and rule-based engines enable the creation of situational dashboarding, invoicing and regulatory compliance reports.

    Testimonial

    “The iGreen system is our core software for billing and operations inspection”

     

    Assaf Meir, PSP CEO

    MEKOROT central water treatment plant.

    DCIM100MEDIADJI_0006.JPG

    Testimonial

    ocated in the low Galilee district, the Eshkol filtration plant is a world class large facility, treating water from the sea of Galilee and conveying it through a long canal and pipelines.
    The 1st phase of the project is focused on a wide range of KPI’s supporting the overall process and operational aspects of the plant.
    The 2nd phase, which was kicked-off in May, is aiming to optimize the plant challenging chlorination and energy policies.
    Israel is relying more and more on its seawater desalination plant, which ironically turns this WTP to be even more important as a balancing factor, a huge storage and a reduced energy water resource.

    Menu